Testimonials

Testimonials
Contact
Slider
Fortescue Metals Group

CLOUD BREAK MINE CASE STUDY

2 Gulf Transfer Chutes

Increased output from existing conveyor infrastructure.
Prior to installation of Gulf Conveyor System Transfer Chutes, the best they could get out of the Cloud Break Mine was 65,000 tonnes a day with an average daily tonnage of approximately 50,000 tonnes.

With Gulf’s transfer chutes installed the best is now is 135,000 with an average of around 100,000 a day. That speaks volumes.