Material: Iron Ore
Status: 2013
Solution: StallFlow Chute and SmartFlow Deflector
The particular chute allowed for ROM Ore (-250mm) at 9,500tph. A SmartFlow Deflector was installed to feed both screens and scrubbers. A right angled StallFlow Chute was also installed to remove prominent belt rips.